Crusher Breakdown Repairs & Electrical Fault Finding
High-inertia starting overloads, severe vibration-induced wiring breaks, and lube-oil interlock trips can completely shut down mining and quarry processing plants. Lectro Power Systems provides specialised electrical diagnostics, heavy motor starter overhauls, and control repairs for industrial crushers across Western Australia.
Symptoms We Resolve
Common Crusher Faults We Diagnose & Fix
High-Inertia Starting Trips
Adjusting soft starter torque profiles, testing liquid resistance starters, and replacing failing bypass contactors.Lube-Oil Pressure & Flow Interlocks
Diagnosing faulty oil pressure transducers, differential flow switches, and temperature cut-outs.Vibration-Induced Terminal Failures
Repairing loose motor connection studs, fractured terminal boxes, and cracked conduit runs.Tramp Metal Detector Trips
Calibrating metal detector search coils, pulse timer circuits, and automated reject chute actuators.Main Drive Motor Winding Breakdown
Conducting insulation resistance (megger) and winding balance tests on high-kilowatt motors.Hydraulic Toggle & Gap Setting Faults
Troubleshooting proportional hydraulic valves, gap positioning encoders, and hydraulic power pack starters.
The Lectro Advantage
Why Choose Lectro for Crusher Repairs
Heavy motor starting specialists
Deep technical expertise tuning large soft starters, VSDs, and slip-ring motor starter banks.Severe-environment electrical ruggedising
Installing vibration-resistant, dust-sealed terminations built for heavy mining and quarry plant.Critical safety interlock protection
Wiring fail-safe lubrication and tramp-iron interlocks to safeguard major mechanical assets.
FAQs